KB0006

Deploying a New Edge Node

By Stephen Schwetz

There will be times within the NSX lifecycle when you could be required to deploy a new edge node, including:

  • The edge node has become cpu constrained;
  • The NSX environment needs to have additional throughput, and you are already running large edge nodes; or
  • The edge node has become corrupted and needs to be replaced to restore service.

TLDR - Here is a Video

<video controls width=100% preload="auto" muted loop> Your browser does not support the video tag. </video>

Step-By-Step Guide

  1. Log in to the NSX manager; the global or local manager is suitable. If you are using the global manager, you must select the local manager for the environment to which you will add the edge node.
  2. From the NSX manager screen select System from the top menu bar. image-20231014214734614

  3. From the left hand menu click on Fabric.

    image-20231014214816875

  4. From the menu that has extended from below the Fabric option select Nodes.

    image-20231014214840970

  5. Select Edge Transport Nodes from the secondary menu that has appeared on the right.

    image-20231014214853127

  6. Select + Add Edge Node from the action menu.

    image-20231014214909337

  7. You will then be presented with the Add Edge Node wizard

    • Fill out the name of the node, this will be how it is displayed in the UI
    • Fill out the FQDN1
    • Select the Form factor for the node. 2
    • Do not use Small unless it it for a lab environment
    • Then click next

    image-20231014215033016

  8. Fill in the User and Password for the

    1. Admin Account (enable ssh)

    2. Root Account (enable ssh) and

    3. Audit Account

    4. Then click next

    image-20231014215956066

    image-20231014215014331

  9. Select and fill out the

    1. Compute Manager (vCenter)

    2. Cluster

    3. Resource pool and

    4. Datastore

    5. Click Next

    image-20231014215130237

  10. Set the

    1. TEP ip assignment to match your environment

    2. The Managment Interface

    3. Search Domain Names

    4. DNS Servers and

    5. NTP Servers

    6. Click Next

    image-20231014215724585

  11. Setup the edge node switching

    1. Name the Switch as per your environment
    2. Select thr Transport Zones
    3. Uplink Profile
    4. TEP Assignment and if required the IP Pool and
    5. Set your uplinks
    6. Click finish

    image-20231014215328822

    image-20231014215527338

  12. If your deployment show as unsuccessful

    image-20231014220520035

    1. Click on actions > Change Deployment Config

      image-20231014220544393

    2. Edit your configuration / click save image-20231014220605973

  13. One you have seen it deploying, you can monitor it’s progress via the vCenter that it is deployting to image-20231014220617585

  14. The node will sit at not ready for some time, this is normal
class="highlight">
1
![image-20231014220627943](/assets/img/kb0006/image-20231014220627943.png)
  1. Once completed it will change to success

    image-20231014220639669)

  1. Fully Qualified Domain Name 

  2. Ensure that you have selected the correct node sizing for the workload that you are expecting, as you cannot resize an edge node, you will have to deploy a new edge node of the correct size and replace it 

Related Posts

Share: Facebook LinkedIn